Our actions · technical and financial partners · in English

Donor programmes in Chad,
and where we connect.

World Bank, European Union and European cooperation, United Nations, African Development Bank, global funds: we surveyed the programmes under way or in preparation in Chad, looking first for those that reach Mandoul province. For each: what it funds, where, until when, and how the association can connect to it — a written request, a list of localities to join, a consultation to follow. None of these programmes funds the association: they are doors to knock on. Survey of 29 September 2026, each source opened one by one.

40 programmes surveyed19 reach Mandoul1 already active in Bédjondosurvey of 29 September 2026
37programmes under way or in preparationchecked one by one on the donors’ official portals
19name Mandoul or Koumrain their official documents or activities
1already present in Bédjondowomen’s health forums on 27 September 2026 (CARE, BASE, AFD)
8windows being decided nowlocality lists, consultations, project design

In brief

What this survey changes
for our advocacy.

Calendar

What is being decided
now.

Lists and programmes close in the coming months. Each line links to the programme or window concerned.

WhenWhatWith whom
before 28 October 2026PRA/OSIM call for diaspora associations in FranceFORIM
by December 2026Bédjondo health centres in results-based financing (PRPSS, closing end 2026)Mandoul health delegation
2026PAEPA II borehole lists (contracts delayed, lists still open)PAEPA coordination, Ministry of Water
2026SmartEd school selectionProvincial education delegation
2026PATN list of 500 unserved areas and PAAET batch of 700,000 solar kitsMinistry of Digital Economy; SNE
2026-2027Consultations on the UN framework 2027-2030 and the IFAD programmeResident Coordinator’s Office; IFAD
before March 2027Design of SAHIT-NA, successor to PRPSSMinistry of Health; World Bank
2026-2027ACPESI-4.0 feasibility studies (30 training centres)Ministry of Vocational Training; AfDB

The programmes

Each programme,
donor by donor.

Amount, period, areas, how we connect and the source: one card per programme, from closest to Bédjondo to furthest. Open a donor family to read its cards.

World Bank9 programmes, 4 naming Mandoul, Koumra or Bédjondo

Koumra namedOngoing

PAAET — Chad Energy Access Scale-up

World Bank (IDA) — Ministry of Energy, SNE · P174495

Amount
USD 295M
Period
2022 → June 2027
Areas
Solar plant with storage in Koumra (procurement plan, September 2026); a batch of 700,000 solar kits “for the other areas” under procurement

How we connect. Ask the project unit and SNE in writing to include Bédjondo in the next batch of kits and in the grid extension from Koumra, with a census of households and services.

Advocacy: Light for Bédjondo

Source: World Bank, procurement plan PAAET

Mandoul namedEnding soon

PRPSS — health system performance (results-based financing)

World Bank (IDA, GFF) — Ministry of Health · P172504

Amount
USD 240M
Period
2021 → December 2026
Areas
Eight provinces including Mandoul; Koumra hospital among the provincial hospitals to be upgraded

How we connect. Before December 2026, ask the Mandoul health delegation to bring Bédjondo’s health centres into results-based financing.

Advocacy: Health care in Bédjondo

Source: World Bank, appraisal document PRPSS

Mandoul namedOngoing

SWEDD+ — women’s empowerment and demographic dividend

World Bank (IDA) · P176693

Amount
USD 82.5M (Chad)
Period
2023 → 2028-2030
Areas
Extended to Mandoul (17 of 23 provinces)

How we connect. Put Bédjondo’s women’s groups and “safe spaces” forward to the national unit, and apply as a community relay.

Advocacy: A school worthy of its pupilsAdvocacy: Health care in Bédjondo

Source: World Bank, appraisal document SWEDD+

Mandoul namedOngoing

Contingent Emergency Response (CERP)

World Bank (IDA) · P511560

Amount
triggered in a crisis
Period
2026 → 2032
Areas
Mandoul among the provinces with multi-hazard response plans

How we connect. Document floods and epidemics in Bédjondo and pass them to Mandoul civil protection.

Source: World Bank, project document

Southern ChadOngoing

PATN — Chad digital transformation

World Bank (IDA) — Ministry of Communications and Digital Economy · P180000

Amount
USD 92.2M
Period
2024 → April 2029
Areas
3G/4G in 500 unserved localities, community digital centres; list of unserved areas not published; presented to Moyen-Chari authorities in March 2026

How we connect. Ask in writing for Bédjondo and its cantons to be on the list of 500 unserved areas, and for a community digital centre.

Advocacy: Broadband

Source: World Bank, appraisal document PATN

NationalIn preparation

SAHIT-NA — health system resilience (PRPSS successor)

World Bank (IDA) — Ministry of Public Health · P518325

Amount
USD 80M (indicative)
Period
approval expected March 2027
Areas
Extends results-based financing “to the remaining provinces”; areas not specified

How we connect. Window open during design: send the ministry and the Bank office a note on Bédjondo’s health map.

Advocacy: Health care in Bédjondo

Source: World Bank, project page SAHIT-NA

NationalOngoing

Improving learning outcomes

World Bank (IDA) — Ministry of National Education · P175803

Amount
USD 144.1M
Period
2022 → October 2027
Areas
1,500 classrooms with latrines and water points; community teachers; national

How we connect. Ask for Bédjondo schools to be on the construction lists and for community teachers to be registered.

Advocacy: A school worthy of its pupils

Source: World Bank, appraisal document

NationalIn preparation

Foundational learning and skills for employment

World Bank (IDA) · P518731

Amount
USD 60M
Period
approval expected May 2027
Areas
Not specified

How we connect. During preparation, propose Bédjondo’s vocational training centre as a pilot site.

Advocacy: The vocational training centreAdvocacy: A school worthy of its pupils

Source: World Bank, project page

NationalOngoing

Statistics and census (HISWACA)

World Bank (IDA) — INSEED · P180085

Amount
USD 105M
Period
2023 → 2029
Areas
National

How we connect. Ask INSEED for census data by municipality and canton to support every advocacy paper.

Source: World Bank, appraisal document

European Union and European cooperation12 programmes, 9 naming Mandoul, Koumra or Bédjondo

Active in BédjondoOngoing

DEESSE — women’s sexual and reproductive health and rights (PASFASS2 component)

AFD — CARE France, BASE, Groupe URD · AFD CTD1280

Amount
€11M (CARE component €5.25M)
Period
2024 → February 2028
Areas
Mandoul and Logone Oriental; community forums held in Bédjondo on 27 September 2026 by BASE Mandoul

How we connect. The partner most present in Bédjondo: offer BASE Mandoul a community relay (women’s groups, messages in Bedjond) and report health-centre needs to it.

Advocacy: Health care in Bédjondo

Source: Alwihda Info, Bédjondo forums

Koumra namedEnding soon

AQUEDUCT-ALAPAJ “Bâtisseuses d’avenir” — non-formal education and literacy

European Union and AFD — Enfants du Monde · UE 2023-PC-30871 · AFD CTD1248

Amount
€37.8M
Period
2022 → 2026-2027
Areas
Mandoul (42 literacy centres, 30 non-formal education centres; committees supported in Koumra in April 2026), Logone Oriental, Ouaddaï, Wadi Fira

How we connect. Ask Enfants du Monde whether Bédjondo has centres, and offer diaspora support to keep them running after the project.

Advocacy: A school worthy of its pupils

Source: Tchadinfos, 27 April 2026

Koumra namedOngoing

Vocational skills along the N’Djamena–Douala corridor

AFD — Enfants du Monde, ESSOR (and EU programme FORMAPRO, €30M)

Amount
not found (FORMAPRO: €30M)
Period
launched in Koumra on 10 June 2026, 4 years
Areas
Mandoul province (launch in Koumra); exact link with FORMAPRO to be confirmed

How we connect. Direct addressee of our vocational training advocacy: ask for Bédjondo’s training centre to be selected as a partner centre.

Advocacy: The vocational training centre

Source: Alwihda Info

Koumra namedOngoing

LAPIA — social cohesion and peaceful coexistence in the south

European Union (CSO programme) — Coginta · NDICI CSO/2024/456-913

Amount
€2M
Period
November 2024 → October 2027
Areas
Logone Oriental, Mandoul (Mandoul Oriental, Koumra), Moyen-Chari; 18 dialogue committees

How we connect. Propose extending a dialogue committee to the Bedjond cantons, with radio messages in Bedjond.

Source: Coginta

Mandoul namedOngoing

MBAIDENE — women’s resilience, rights and opportunities

European Union (call “Women, Peace and Security 1325”) · 2026-PC-55732

Amount
€2.6M (sub-grants up to €60,000)
Period
August 2026 → August 2031
Areas
Mandoul, Logone Occidental, Lac

How we connect. Identify the grant-holding NGO through the EU delegation and position the association as a local sub-grantee in Mandoul.

Source: EU, call EuropeAid/184496

Mandoul namedOngoing

SODEFIKA — groundnut, sesame and shea value chains

Swiss cooperation (SDC) — Caritas Switzerland · DDC 7F08749

Amount
CHF 8.2M
Period
2023 → November 2027
Areas
Logone Oriental, Mandoul, Moyen-Chari; 120,000 people, at least 60% women

How we connect. Point out Bédjondo’s sesame and shea producer groups so they can access the project’s seeds, storage and credit.

Source: Caritas Switzerland

Mandoul namedEnding soon

Non-timber forest products (néré, shea, honey)

Swiss cooperation (SDC) · DDC 7F10500

Amount
CHF 12.4M
Period
2021 → February 2027
Areas
Logone Oriental, Mandoul, Moyen-Chari

How we connect. Point out shea and néré processors, and ask whether a phase 2 is planned after 2027.

Source: SDC, project page

Mandoul namedOngoing

NexSud — socio-economic resilience in southern Chad

AFD and European Union — Caritas Switzerland (lead) · AFD CTD1277

Amount
€13M AFD + €7M EU (figures to reconcile)
Period
2024 → 2029
Areas
Logone Oriental, Mandoul, Moyen-Chari; localities not specified

How we connect. Ask Caritas Switzerland Chad whether Mandoul Occidental cantons are covered and, if not, for Bédjondo’s inclusion at the mid-term review.

Advocacy: Safe water for every neighbourhood

Source: AFD, project page

Mandoul namedOngoing

Agri-food entrepreneurship programme (PEA, including PAMELOT)

European Union (Global Gateway) — AFD, GIZ · ACT-61843

Amount
€45.2M
Period
2025 → 2029
Areas
N’Djamena–Douala corridor, including Mandoul (technical assistance sheet)

How we connect. Introduce Bédjondo’s agri-food entrepreneurs to the operators of the AFD component (ESSOR, Bet Al Nadjah).

Advocacy: The vocational training centre

Source: Ministry of Vocational Training

Southern ChadOngoing

Access to modern energy services in southern Chad

European Union — GIZ · 2026-PC-53519

Amount
€20.5M (and €27.3M for the N’Djamena–Moundou–Sarh axis)
Period
2026 → 2029
Areas
Two secondary towns on the corridor electrified with renewables; which ones: not published

How we connect. Add GIZ and the EU delegation to the addressees of our electricity advocacy and ask for the town selection criteria.

Advocacy: Light for Bédjondo

Source: IATI register

Southern ChadOngoing

DEBACOS — southern cotton basin

AFD — Ministry of Agricultural Production · CTD1262

Amount
€14M
Period
2024 → June 2029
Areas
Cotton basin (7 southern provinces); Mayo-Kebbi Ouest and Moyen-Chari named, Mandoul not

How we connect. Ask for the list of selected areas and advocate for Mandoul Occidental, a cotton-growing area.

Source: Tchadinfos, 13 May 2026

NationalOngoing

Support to local authorities

Swiss cooperation — UNDP (RGDL), Initiative Développement (AGIL) · DDC 7F11681

Amount
CHF 4.5M (CHF 22M with partners)
Period
September 2026 → September 2029
Areas
23 provincial councils; 4 pilot municipalities not named; 29 citizen initiatives to fund

How we connect. Propose a Bédjondo “citizen initiative” together with the town hall, and check whether the municipality can be a pilot.

Advocacy: Note to the municipality

Source: SDC, project page

United Nations system8 programmes, 3 naming Mandoul, Koumra or Bédjondo

Mandoul namedOngoing

8th country programme — maternal health, family planning, GBV, youth

UNFPA

Amount
USD 60M
Period
2024 → 2028
Areas
12 provinces including Mandoul, Logone Oriental and Moyen-Chari

How we connect. Ask for Bédjondo’s health centre to join the emergency obstetric and newborn care network, and offer the association as a youth and health relay.

Advocacy: Health care in Bédjondo

Source: UNFPA, country programme

Mandoul namedOngoing

Humanitarian Response Plan 2026

OCHA and the Humanitarian Country Team

Amount
USD 986M required, 35% funded at 30 June
Period
2026
Areas
Mandoul Occidental among the 29 priority departments of the WASH cluster; flooding possible in Mandoul

How we connect. Core argument of our water advocacy: send the WASH cluster a needs sheet per Bédjondo neighbourhood, and report floods and tensions through the alert tools.

Advocacy: Safe water for every neighbourhoodAdvocacy: Health care in Bédjondo

Source: OCHA / ReliefWeb, HNRP 2026

Mandoul namedTo be checked

RENFORT — agro-pastoral entrepreneurship for youth and women

IFAD (+ Green Climate Fund) · 2000003305

Amount
over USD 100M according to the press (not verified)
Period
2023 → March 2029
Areas
Six provinces including Mandoul (departments not specified); disbursements suspended late 2024 – early 2025 after an audit

How we connect. Ask the management unit whether Mandoul departments are covered and introduce Bédjondo’s youth and women’s groups.

Advocacy: The vocational training centre

Source: IFAD, country programme evaluation 2026

NationalIn preparation

Country programme 2027-2030 (water, health, education, protection, civil registration)

UNICEF

Amount
USD 288.8M planned
Period
2027 → 2030 (submitted September 2026)
Areas
Provinces not named; “child-friendly” municipal plans, decentralised civil registration, solarisation of services

How we connect. Propose Bédjondo as a pilot for a “child-friendly” municipal plan and a decentralised civil registration centre.

Advocacy: Safe water for every neighbourhoodAdvocacy: Health care in BédjondoAdvocacy: A school worthy of its pupilsAdvocacy: Note to the municipality

Source: UNICEF, country programme

NationalIn preparation

UN–Chad Cooperation Framework 2027-2030 (UNSDCF)

Office of the UN Resident Coordinator

Amount
to be defined
Period
work launched on 22 May 2026
Areas
Convergence provinces to be defined

How we connect. Ask to take part in civil-society consultations and submit a “Mandoul Occidental / Bédjondo” note summarising our advocacy papers and the note to the municipality.

Advocacy: Note to the municipalityAdvocacy: Safe water for every neighbourhoodAdvocacy: Health care in BédjondoAdvocacy: A school worthy of its pupils

Source: Tchadinfos, 22 May 2026

NationalIn preparation

Mini-grids and rural electrification (Africa Minigrids, GEF project preparation)

UNDP and GEF — ADERME · PNUD 00135028 · 01006057

Amount
USD 600,000 (GEF); preparation USD 44,000
Period
preparation 2026 → 2027
Areas
Sites not chosen

How we connect. During preparation, ask UNDP and ADERME to list Bédjondo among candidate sites for solar mini-grids.

Advocacy: Light for Bédjondo

Source: UNDP, open.undp.org

NationalOngoing

Governance for local development (RGDL)

UNDP · 01005819

Amount
USD 450,000
Period
March 2026 → March 2029
Areas
National

How we connect. Propose Bédjondo as a pilot for planning and participatory budgeting tools.

Advocacy: Note to the municipality

Source: UNDP, open.undp.org

NationalTo be checked

Pilot inventory of intangible cultural heritage in six provinces

UNESCO

Amount
USD 99,610 to 250,000 (sources differ)
Period
status “ongoing”
Areas
Six provinces, not found

How we connect. Ask the Ministry of Culture whether the Sara-Bedjond country is included, and offer the inventory sheets of the Bedjond Digital Heritage programme.

Source: UNESCO, intangible heritage

African Development Bank and global funds5 programmes, 2 naming Mandoul, Koumra or Bédjondo

Mandoul namedOngoing

Maternal and child health — 104 health facilities

Islamic Development Bank, Lives and Livelihoods Fund, Government, UNICEF

Amount
USD 48.4M
Period
2023 → around 2028
Areas
Ennedi Est, Mandoul, Salamat; 20 facilities built and 84 rehabilitated, Mandoul districts not specified

How we connect. Ask the Mandoul health delegation and UNICEF for the list of selected facilities, and advocate for Bédjondo’s health centre (rehabilitation, obstetric care, solar water).

Advocacy: Health care in Bédjondo

Source: Islamic Development Bank

Mandoul namedOngoing

PAEPA SU MR phase II — semi-urban and rural water supply and sanitation

AfDB (Transition Support Facility) — Ministry of Water · P-TD-E00-006

Amount
UA 28M
Period
2023 → December 2028
Areas
54 piped mini-networks including Mandoul, 225 hand-pump boreholes, 500 latrines; Mandoul localities named: Nadilli (Moïssala), Mouroum Goulaye, Béssada, Béboro cantons — not Bédjondo. 4.9% disbursed in April 2026

How we connect. Direct addressee of our water advocacy: borehole lists are not closed; ask the programme coordination to add Bédjondo and its villages, with a needs sheet per locality.

Advocacy: Safe water for every neighbourhood

Source: AfDB, PAEPA SU MR II page

NationalOngoing

SmartEd — inclusive basic education

IsDB, BADEA, OPEC Fund, Saudi Fund, Global Partnership for Education

Amount
about USD 160M
Period
2026 → 2030
Areas
All 23 provinces; 2,400 to 2,848 classrooms, 35,000 teachers trained; school selection under way

How we connect. Send the provincial delegation a “Bédjondo schools” file now (enrolment, classes under straw shelters, latrines) for the site list.

Advocacy: A school worthy of its pupils

Source: Tchadinfos, 16 June 2026

NationalIn preparation

ACPESI-4.0 — skills and employment (at least 30 training centres)

AfDB

Amount
not found
Period
feasibility studies in 2026
Areas
Sites not chosen

How we connect. The most strategic entry point for our training advocacy: approach the ministry and the AfDB office now so that Bédjondo is among the centres studied.

Advocacy: The vocational training centre

Source: AfDB, country strategy 2026-2031

NationalOngoing

Malaria, HIV, tuberculosis (current grants, cycle 8 in preparation)

Global Fund — Ministry of Health, UNDP

Amount
USD 110.6M (HIV-TB, 2024-2027)
Period
2024 → 2027
Areas
National; 2026 bed-net campaign in 16 provinces

How we connect. Report villages not reached by bed nets to the country coordinating mechanism and ask to join the cycle 8 country dialogue.

Advocacy: Health care in Bédjondo

Source: Global Fund, country data

Other partners1 programme, 1 naming Mandoul, Koumra or Bédjondo

Koumra namedOngoing

Drinking water supply assistance to Chad

China (grant) — Ministry of Water and Energy

Amount
not published
Period
since October 2024
Areas
Mandoul and Salamat: over 500 boreholes, 57 stations; Koumra (Madan quarter), Kouman, Ngonbé named — not Bédjondo

How we connect. Ask the provincial water delegation for the list of sites built in Mandoul Occidental; if Bédjondo is missing, request its inclusion in an extension, copying the Chinese embassy.

Advocacy: Safe water for every neighbourhood

Source: Xinhua / People’s Daily, 2 July 2026

Funding windows

Where the association can apply
itself.

All require an association in good standing — statutes, registration receipt, a bank account in its name — or a sister diaspora association registered abroad. Hence the importance of the formalities under way.

Swiss cooperation small projects

For
Chadian organisations (co-funding of at least 20%)
Amount
up to CHF 200,000, 18 months
Deadline
rolling, two months before start

Training, entrepreneurship, women and youth, social cohesion, climate; submission by e-mail to the N’Djamena office. The window most directly open to the association, once its papers are in order.

PRA/OSIM 2026 (FORIM, funded by AFD)

For
Diaspora associations registered in France (1901 law, one year old)
Amount
up to €15,000, at most 70% of the project
Deadline
28 October 2026, 12:00 (Paris)

Support by an accompanying operator is compulsory; contact FORIM as soon as possible. Possible only if a sister association exists in France.

MBAIDENE sub-grants (European Union)

For
Local organisations in Mandoul, Logone Occidental and Lac
Amount
up to €60,000
Deadline
set by the grant-holding NGO (project launched August 2026)

Women, peace and security; identify the grant holder through the EU delegation.

AFD CSO initiatives

For
French NGOs, or local ones that have already received over €100,000 from AFD
Amount
variable
Deadline
2026 call closed on 9 October; aim for 2027 with a French NGO

Out of reach this year.

Good to know

Closed, or outside
our area.

So as not to knock on the wrong door.

5 programmes closed or outside our areaWomen’s groups and agro-pastoral conflict in Logone Oriental and Mandoul · PMCR · PASER · PILIER · USAID

Koumra namedClosed

Women’s groups and agro-pastoral conflict in Logone Oriental and Mandoul

Peacebuilding Fund — Humanity & Inclusion · IRF-566

Amount
USD 1.8M
Period
September 2024 → 25 September 2026
Areas
Logone Oriental; Mandoul Oriental (Koumra) — not Mandoul Occidental

How we connect. The project has just ended: ask HI, UFEP and the Fund secretariat for a phase 2 reaching Mandoul Occidental.

Source: MPTF, project document

Mandoul namedClosed

PMCR — rural mobility and connectivity

World Bank (IDA) · P164747

Amount
USD 45M
Period
closed on 30 April 2026
Areas
211 km of rural roads in Mandoul and Moyen-Chari, bridge over the Mandoul at Bédaya; no successor identified

How we connect. Our roads advocacy named it as addressee: write instead to the Ministry of Infrastructure, the Road Maintenance Fund and the Bank about its successor.

Advocacy: Streets and rural roads

Source: World Bank, restructuring 2026

Outside our areaOngoing

PASER — water and resilience

World Bank (IDA) · P507957

Amount
USD 155.5M
Period
approved on 18 June 2026
Areas
Eastern Chad, N’Djamena and 13 small towns in the east — not Mandoul

How we connect. Do not present it as an addressee of our water advocacy; favour the AfDB, UNICEF and Swiss cooperation.

Source: World Bank, appraisal document

Outside our areaOngoing

PILIER — flood control and urban resilience in N’Djamena

World Bank (IDA) — N’Djamena city hall; community component implemented by UNDP

Amount
USD 150M (IDA grant, 2023) + USD 20M for the community component (May 2024)
Period
approved on 6 April 2023; six years of implementation according to the press
Areas
N’Djamena only (ten district municipalities): drainage, 200 km of gutters cleared in 2026, neighbourhood committees and early warning — not Mandoul

How we connect. Outside our area: do not write to it about Bédjondo. Its community component (neighbourhood committees, flood early warning, implemented by UNDP) can serve as a model for a request for Bédjondo, addressed to Mandoul civil protection under the Contingent Emergency Response (CERP).

Source: World Bank, press release of 6 April 2023

Outside our areaClosed

USAID — closed on 1 July 2025

United States

Amount
USD 6.3M reported for fiscal year 2025
Period
—
Areas
No active US programme identified in Mandoul

How we connect. Do not target.

Source: Donor Tracker

Survey of 29 September 2026, from official portals (World Bank, AfDB, the EU’s IATI register, Swiss cooperation, AFD, UNDP, UNICEF, UNFPA, IFAD, OCHA, Global Fund) and, failing that, the Chadian press, cited as such. Where an amount, a date or an area was not found, we say so. Programmes change quickly: this survey will be redone every six months. The French page adds, for each of our themes and projects, the programmes that match it: programmes by theme and by project (French). A mistake, a programme missed? Write to us. See also our sectors of intervention.